- Cranes, Hoists & Material Handlers (1)
- Crawler Cranes (1)
- Lattice Boom (1)
- Link-Belt (1)
- LS-518 (1)
- MCM Construction (1)
- United States (1)
- California (1)
- Demolition Equipment (2)
- Glass Manipulator Handlers (1)
- Truck Cranes (1)
- Cranes, Hoists & Material Handlers (19535)
- Mini Cranes (263)
- All Terrain Cranes (1524)
- Articulating Knuckle Boom Cranes (5923)
- Boom Trucks (1249)
- Bucket Truck Aerial Platforms (1)
- Cable Handler Pullers (13)
- Carry Deck Industrial Cranes (342)
- Construction Elevator Hoists (62)
- Container Handlers (3)
- Crawler Cranes (1963)
- Derrick Cranes (90)
- Draglines (22)
- Floor Cranes (7)
- Gantry Cranes (215)
- Glass Manipulator Handlers (16)
- Hoist Winches (45)
- HookLifts (136)
- Hydraulic Gantries (1)
- Industrial Elevators (3)
- Jib Cranes (4)
- Loader Cranes (75)
- Marine Cranes (55)
- Material Handlers (503)
- Material Hoists (17)
- Mobile Harbour Cranes (3)
- Offshore Cranes (17)
- Overhead Cranes (1)
- Pick & Carry Cranes (269)
- Railroad Cranes (2)
- Ringer Cranes (8)
- Roofing Conveyors (10)
- Rough Terrain Cranes (1350)
- Service Cranes (476)
- Sign Cranes (12)
- Teletruck (1)
- Tower Cranes (3383)
- Trailer Mounted Cranes (11)
- Trolley Booms (32)
- Truck Cranes (1268)
- Wallboard Forming Loader Cranes (153)
- Wheel Cranes (4)
- Wind Tower Cranes (2)
- Work Platforms (1)
- Drilling, Piling and Foundation Rigs (287)
- Digger Derricks (114)
- Drilling Rigs (152)
- Pile Driving Rigs (20)
- Piling Cranes (1)
- Earthmoving Equipment (49)
- Crawler Carriers (45)
- Loader Cranes (1)
- Marine Cranes (1)
- Rough Terrain Cranes (2)
- Forestry & Logging Equipment (124)
- Forklifts (1)
- Lift Truck Forklifts (11)
- Loader Cranes (61)
- Material Handlers (41)
- Trailers (8)
- Trucks (2)
- Heavy Lift Hydraulic Systems (49)
- Hydraulic Gantries (45)
- Strand Jacks (4)
- Industrial Support (68)
- Air Compressors (63)
- Utility Vehicles (5)
- Loaders, Skid Steers & Tractors (1)
- Loader Cranes (1)
- Reach Stackers, Port & Terminal Handling Equipment (376)
- Container Cranes (5)
- Container Handlers (91)
- Gantry Cranes (1)
- Marine Cranes (6)
- Mobile Harbour Cranes (81)
- Reach Stackers (171)
- Straddle Carriers (2)
- Terminal Tractors (19)
- Material Plant Equipment-Concrete, Asphalt, Aggregate (3)
- Reach Stackers (3)
- Mining Equipment & Machinery (15)
- Drilling Rigs (12)
- Lift Truck Forklifts (1)
- Rough Terrain Cranes (1)
- Teletruck (1)
- Parts, Attachments, Components, Manuals, & Accessories (280)
- Suspended Personnel Platform (13)
- Anti-Two Block (A2B) Systems (1)
- Augers (3)
- Boom Raise System (2)
- Buckets (Concrete - Clam - Dragline) (70)
- Crane Bumpers (45)
- Grapples (26)
- Hoist Winches (2)
- Hook Blocks (5)
- Load Moment Indicator (LMI) Systems (1)
- Lubricants-Telescopic Boom (1)
- Lubricants-Wire Rope (3)
- Outrigger Pads, Mats & Cribbing (56)
- Pallet Fork Attachments (Cranes & Equipment) (1)
- Pile Driving Rigs (4)
- Pipe Manipulators (4)
- Rigging - Slings, Spreader Bars & Components (25)
- Steel Crane Mats (9)
- Tire Handler Manipulators (6)
- Vibration Dampeners (1)
- Wireless Power Line Detection (2)
- Platform Aerial Lift Devices & Bucket Trucks (2694)
- Boom Lifts-Articulating (615)
- Boom Lifts-Articulating Telescopic (13)
- Boom Lifts-Telescopic (514)
- Bridge Inspection Access Platforms (55)
- Bucket Truck Aerial Platforms (749)
- Floor Cranes (3)
- Man Baskets & Platforms (3)
- Platforms Lifts (3)
- Scissor Lifts (521)
- Sign Cranes (1)
- Speed Level Lifts (48)
- Vertical Mast Lifts (152)
- Wheel Cranes (1)
- Work Platforms (16)
- Rail Equipment (40)
- Boom Lifts-Articulating (2)
- Bridge Inspection Access Platforms (4)
- Loader Cranes (1)
- Material Handlers (2)
- Railroad Cranes (31)
- Site Dumpers & Crawler Carriers (23)
- Crawler Carriers (23)
- Telehandlers, Forklifts & Lift Trucks (2845)
- Telehandlers (1112)
- Articulating Knuckle Boom Cranes (1)
- Forklifts (895)
- Front End Articulating Loader (2)
- Lift Truck Forklifts (789)
- Pallet jack (13)
- Teletruck (17)
- Tire Handler Manipulators (16)
- Transport Equipment - SPMT's -Trailers & Machinery Carts (193)
- Container Handlers (3)
- HookLifts (1)
- Pole Utility Trailers (23)
- Self-Propelled Module Transporters (SPMT's) (35)
- Trailers (122)
- Trucks (9)
- Utility & Aerial Transmission Equipment (2)
- Boom Lifts-Telescopic (1)
- Bucket Truck Aerial Platforms (1)
- 3-Seat (4)
- 3-Wheel (68)
- 6-Seat (1)
- Amphibious (1)
- Articulating (17)
- Articulating Boom (108)
- Articulating Telescopic Boom (152)
- Show All
- 600SA (2)
- ABG Cranes (1)
- ABI (1)
- ACE (Action Construction Equipment) (87)
- ALFA (30)
- AUSA (22)
- Aerial Access (4)
- Show All
MCM Construction
https://mcmconstructioninc.com/
Location: 6413 32nd Street North Highlands, CA 95660
How Close: 620 miles
Email this Company
MCM Construction Inc. founded in 1973 as a general contractor specializing in heavy highway and bridge construction. It all started with the Pocket Road Project in Sacramento and since then, MCM has grown from a small hard-working general contractor into a bridge-building leader with a reputation for quality performance and professional integrity.
After first gaining recognition in the northern part of the state, MCM Construction Inc. ventured into Southern California in the ‘80s to complete several projects beginning with the Universal Avenue/Hollywood Boulevard overcrossing in Universal City. From then on a series of select jobs, including the Century Freeway Project, Paramount I, Central Avenue, Lynwood, Aviation, Paramount II, Avalon, Harbor Interchange, were completed, leading up to the single largest contract milestone to that point for the company – construction of the Long Beach Interchange.
In 1989, MCM Construction played a major role in the rescue of victims trapped on the Cypress Freeway in Oakland after the 7.1 Loma Prieta Earthquake. For many hours after disaster struck, MCM Construction’s president Jim Carter and vice president Harry McGovern were among the first responders who actively supervised the massive rescue effort. Six years later, MCM Construction was awarded the first of two contracts to help realign and rebuild the Cypress Freeway in Oakland.
One of MCM Construction’s greatest team efforts was in Malibu, California on the Pacific Coast Highway in the Emergency Bridge Replacement Effort at the Malibu Lagoon. This key artery of California’s coast was successfully rejoined to the relief of tens of thousands of area residents after MCM Construction’s team was able to complete critical phases of the bridge in a record 35 days, exactly 100 days ahead of schedule.
Our inventory inc includes Compactors Construction Materials Cranes Foundation Dozers Excavators Loaders Motor Graders Water Trucks & Trailers
Beginning in 1997, MCM Construction was awarded three major contracts in Orange County. Work on these three contracts, two relating to the realignment of the 5/91 Interchange, and one for the I-5 Brookhurst/La Palma, resulted in a much needed and immediate easing of visitor access to the Orange County’s renowned Disney amusement complex.
In 2002, work was started on the Noyo River Bridge located in Fort Bragg. Set against the scenic Mendocino shoreline, this oft-photographed bridge perfectly expressed engineering’s ability to harmonize an artful form with useful function and culminated in award-winning results.
In 2006, MCM Construction began work on the Confusion Hill Bridge on highway 101 near Garberville to provide a safe bypass in a dangerous landslide zone. This dramatic structure, which facilitated a safe and efficient route through the Redwood area of the North Coast, was completed in 2011. MCM used award-winning and innovative construction techniques to mitigate environmental impacts to the Eel River.
Beginning in 2007, MCM Construction started work on The San Francisco/Oakland Bay Bridge. As part of the East Span San Francisco Bay Bridge Replacement Project, MCM connected side-by-side skyway bridges to the Oakland Shoreline and toll plaza on Interstate 80. The Oakland Touchdown Project was based on a successful partnership between MCM Construction, Caltrans, the Bay Area Toll Authority, and the California Transportation Commission. Because of the smoothly-run operation, the project was completed ahead of schedule and within budget in 2011. This project was awarded the prestigious “Excellence in Partnership Award” for 2011 by the Associated General Contractors in California.
MCM Construction was also on the scene in 2009 and stepped in to provide emergency repairs after 5,000 pounds of metal collapsed during an evening rush hour commute on the Bay Bridge in San Francisco; MCM worked nonstop with Caltrans to successfully restore the bridge during this emergency.
In 2010, MCM Construction began work on the Yerba Buena Island Transition Structure to erect the western most portion alignment of the east spans of the Bay Bridge. The effort connects the double decked Yerba Buena Island tunnel to the parallel roadways of the Self Anchored Suspension spans (SAS) and completes construction of the new Bay Bridge alignment. This project, expected to be complete in 2013, coupled with the Oakland Touchdown contract, set a new milestone for MCM as constructor of the Alpha and Omega portions of this historic engineering effort.
Cementing its leadership position in Southern California, the company began construction in 2011 on a fixed-span bridge over the Cerritos Channel in Wilmington, California near Long Beach, replacing the Schuyler Heim Bridge which did not meet earthquake standards. Once finished, the much-needed new four-lane elevated expressway will allow cars and trucks to cross over from Terminal Island to major thoroughfares in the Harbor region of Southern California. This $180 million project is expected to be completed in 2016.
Also in 2011, MCM was selected from an elite group by Caltrans to participate in an innovative—– process referred to as a “Design-Build” process from the new connector ramp/bridge onto the interchange of Interstate 605/Interstate 10 in Baldwin Park, CA. This is a new role for MCM Construction. In the past four decades MCM Construction has completed over 300 projects, including more than 1,000 bridges in California and Arizona. The company continues to provide a critical contribution to our nation’s transportation infrastructure.
Link-Belt MCM Construction Cranes for Sale and Rent
Link-Belt LS-518 150-ton Lattice Boom Crawler Crane For Sale
Location |
Sacramento, California US 627 miles |
---|---|
Make | Link-Belt |
Model | LS-518 |
Tons | 150.00 |
Year | 1976 |