On March 17, 2016, T.Y. Lin International‘s San Diego Construction Management Team achieved a major project milestone on the Quarry Creek Bridge in Carlsbad, CA with the placement of the bridge’s girders. This project required an innovative construction sequence to avoid entering into the 170-foot-wide Environmentally Sensitive Area (ESA). Maxim Crane was brought in to handle the heavy lifting and utilized a Crawler and All Terrain crane.